organisation
products
keymarkets
experience
library
howden logo
 
 
    contacts home
 
 
Photographs

 

Installations

PD288 Chimney

installation of assembled chimney to PD288 animal carcass incinerator

instal1

RD700 Assembly

3Ts offers site assembly

instal2

RD500 Assembly

Primary chamber, thermal oxidiser and re-heat chamber showing

instal3

RD200 Off Loading

Offloading primary chamber into existing building

instal4

 

Automated Loading
Loading of medical wastes using bin tipping and ram loading system load1
Loading solid wastes from oil rigs using adapted bins on fork lift load2

 

Handover
Group photo after completion of training handover1
Handover celebrations over cake handover2

 

Ash Residue

Logistic Support Base

Ash from oil rigs general wastes typically 5%-6% of original volume

ash1

Dairy Farm

Ash from incinerating 2 cows & 5 calves typically 3%-4% of original volume

ash2

Research Lab

Ash from incinerating camel carcass and veterinary lab wastes typically 3%-4% of original volume

ash3

 

 

Questionnaire